PURPOSE

 1.To prepare accurately the peritoneal dialysis Machine in accordance with the dialysis prescription.   
2.To prevent cross infection.
1.The physician order to be obtained

2.         All Nursing staff working in renal unit should be trained in the preparation of PD Machine.

3.         Two (2) Nurses, of whom one should be an experienced nurse , should carry out this procedure.

4.         A strict Aseptic technique should be maintained throughout the procedure as per policy and procedure.

5.         Hand washing should be preformed as per policy and procedure on hand washing technique.

EQUIPMENT

1.         Trolley cleaned and wiped with sprite 70%.

2.         Peritoneal dialysis lines.

3.         Peritoneal dialysis fluid as per prescription.

4.         On & Off Pack ( Dressing Pack).

5.         Surgical Mask.

6.         Injection heparin.

7.         Additive drugs if any.

8.         Sterile Hand towel.

9.         Frekaderm hand rub.

10.       Frekasept spray.

 

PROCEDURE

SNNursing ActionRationale
01First Nurse washes and dries her hand.  To prevent infection
02Apply Frekaderm hand rub on Both hands and rub thoroughly.   
03Turn the Machine on.   
SNNursing ActionRationale
04After the self-test has been completed press Key (after audible signal).  To ensure that the machine is safe for use.
05Removes any objection off the scale and press key.  To avoid errors in scale test
06Take the dialysate out at the over wrap and place on the heater tray. Press key.  To worm the fluid to body temperature before infusing.
07Check the parameters on the screen and press       key to change setting if necessary. Press key to continue the treatment.  To avoid injury to injury to peritoneum and to prevent shivering.
08Once the heating time has elapsed  the machine is ready for installation of tubing set. Press key.   
09Take the tubing set out of the packaging and close all line clamps.   
10Place the line in the respective upper clamps.   
11Clamp the patient connector into the holder. Press key.   
12Install the lines in the lower clamps.   
13Connect the drainage bag to the drainage line. Press key.   
14Hang dialysate bags on the drip stand.   
15Second Nurse sprays Frekasept to the outer part of insertion port (bag) and the First Nurse connect the lines to bags.  To prevent infection
16Once the tubing set primed automatically, open the clamp on the patient line. Press     key.  To prevent as entry in to the operational Cavity.  
17Once patient line is filled, close the clamp. Press key.   
18Now the Machine is ready to be connected to patient.   Note: Start Key